Public Works Snapshot - April 2026

Published on May 20, 2026

Image of public works staff striping a road
April 2026 Public Works infographic showing road paving, graffiti removal, tree trimming, and traffic calming projects with statistics on potholes, sidewalks, and streetlights repaired.
Infografía de Obras Públicas de abril de 2026 con trabajos de pavimentación, eliminación de grafiti, poda de árboles y mejoras viales, además de estadísticas y proyectos completados.

BY THE NUMBERS

  • 1853 Potholes filled
  • 19.6 Miles of sewer line cleaned
  • 67 graffiti locations addressed
  • 2604 parking citations issued
  • 300 feet of curb and gutter replaced
  • 2600 square feet of sidewalk replaced
  • 285 trees trimmed
  • 164 streetlights repaired

PROJECTS

  • Garner/Pacific/Acosta Plaza Bulb Outs - Completed intersection and bus stop improvements.
  • Tyler Street - City streets crews repaved Tyler St from Iris Dr to the south end.
  • Traffic Calming - Completed installation of traffic circle at Coventry St and raised crosswalk at Victor St.

 

 